Contact Us
New Stair Installs

Architectural Staircases Built from the First Rise

The Stair Guys partner with builders and homeowners to engineer site-built stair systems that meet current IRC code, align with finished floor heights, and become the signature element of your home.

  • 300+ New stairs installed across WNC
  • 1/8" Maximum rise variance we allow
  • 100% Engineer-reviewed stringer layouts
Full-Service Stair Fabrication

We Measure, Engineer, and Install Every Step

From basement-to-loft switchbacks to entry stairs with open risers, we template on-site, fabricate shop drawings, and deliver stringers, treads, risers, and rail systems that land perfectly on your finished floors.

Our in-house crew handles demolition of temp stairs, line-and-level layout, structural fastening, and trim-out—so you get a seamless staircase ready for stain, paint, and move-in day.

See Recent Installs
Outdoor Stair Install

A Hillside Stair Built for Safer Daily Access

This mountain home needed a dependable connection from the upper deck down to the landscaped lower yard. We built a pressure-treated stair system that follows the slope, breaks up the climb with a sturdy landing, and keeps the run open without feeling heavy against the house.

The finished install pairs wood guardrails with wire infill panels for visibility, drainage-friendly framing, and a clean profile that fits the wooded setting. Every tread, rail, and landing was laid out for comfortable movement and long-term exterior use.

View Outdoor Stair Photos
  • Open Wire infill keeps the deck and hillside views clear
  • 100% Exterior-ready treated framing and rail details
What We Build

Stair Systems Tailored to Your Plans

Straight runs • L- and U-shaped stairs • Winder and spiral configurations • Open risers • Box treads • Timber, steel, and hybrid staircases • Code-compliant guardrails and handrails

  • Structural Framing

  • Design & Layout

  • Treads & Finishes

  • Rail Systems

  • Inspection & Trim-Out

Stringer fabrication
Installation Process

Blueprint-Aligned, Code-Ready Stairs

We collaborate with your architect, framer, and finish carpenter to lock in stairwell dimensions, landings, and guard requirements before we cut the first tread. Our team manages shop fabrication, on-site assembly, and inspection so your build schedule stays on track.

Request a Stair Estimate
  • Install Timeline (weeks)

    3-5
  • Field Measurements (Hrs)

    48
  • Years of Experience

    50+
  • Trade Partners

    18
Before & After

From Dated Kit Stairs to a Custom Steel Spiral

This homeowner replaced an aging modular staircase with a sleek steel spiral—opening up the living space and adding a striking architectural centerpiece beneath the vaulted ceiling.

BeforeOld modular staircase before remodel
AfterNew steel spiral staircase after remodel
Start Your Stair Transformation
Start New Construction Right

Book a New Stair Installation Consultation

Share your plans and elevations—The Stair Guys will confirm headroom, layout options, and the perfect railing to complete your build.

Plan Your Stair Install